Supervision of heating, substation and heat network installation

Engineering support on site: checking equipment and completed installation against the agreed documentation. Site visits and coordination with the contractor are tailored to the construction stage and the client’s needs.

Discuss your project

What we check

Equipment compliance with the design, completed works and resolution of observations. Installation questions are assessed against the agreed substation, heating or heat network design.

How support is organised

Scheduled site visits, recorded observations, photographic reports and technical meetings. Visit frequency and inspection stages are agreed in advance so the client understands the scope and deliverables.

Substation installation oversight

The developer or client should establish which substation and heating installation stages need engineering input. Inspection scope, reporting and authority are recorded in the brief and contract. Formal construction control responsibilities are agreed for the particular project.

Changes on site

Equipment substitutions and departures from documentation require technical assessment. Where necessary, proposed changes are discussed with the project team and incorporated into agreed solutions before the next stage.

Before work begins

We discuss the address and type of building, installation progress, available documentation and contractors. Contractual duties and the limits of the engineer’s role are clarified separately for construction control and client-side technical support.

Let’s discuss your building